JPCalc

Estimate, Bid & Quote

Full material + labor + cost estimates. 10% waste included.

Budgeting estimates only β€” not a substitute for engineered plans, a licensed contractor's bid, or permit documents. Verify quantities and local codes before purchase.

Project & Client PRO

Your Company

Saved once and reused on every estimate β€” it appears as the letterhead on your client proposal. Not stored with individual projects, so loading an old bid won't change it.

This Project

Building Type

Wall and ceiling insulation is set separately in Exterior Envelope.

Building Dimensions

Layout & Openings

Attached / Detached Garage

β€”

Foundation Type

Only enter these if the foundation differs from the building footprint β€” e.g. a slab extending past the walls for a porch or stoop, a pad poured larger than the structure, or a basement under only part of the house. Floor framing (joists, subfloor, sill plate) always follows the Building Dimensions, not this footprint.

β€”

Exterior Envelope PRO

Runs are taken from the roof: gutters follow the eaves only, fascia follows the eaves and rakes, and soffit is that run times the Eave Overhang above. Downspouts are figured one per 30 ft of gutter β€” set the rate for this building's height, since a two-story run costs more per drop.

Site Work PRO

Clearing & Grubbing
β€”

Enter only the area you actually clear and grub β€” not the whole parcel. Priced per acre. Leave at 0 to fall back to the graded pad area below.

Mass Grading / Pad Prep
β€”

Grading is priced on the building pad only β€” the foundation footprint plus the working margin β€” not the full cleared area.

Excavation

Excavation volume is derived from the Foundation Type and its dimensions (basement depth, footing trenches, or pier holes).

Backfilling
Septic System

Tank and trench excavation are priced at the Soil Type selected above. Rule of thumb for trench length: roughly 100–150 ft per bedroom in average soil; poor perc or clay can double it. Confirm with your health department's perc results.

Private Well
Electric Service Entrance
Utility Trenching
Rough & Finish Grading
Flatwork

Electrical PRO

4

Code requires at least one at the front and one at the rear of a dwelling, plus one at any porch, deck, or balcony. Each is GFCI-protected in an in-use ("bubble") cover.

Exterior receptacle controlled by an indoor switch β€” typically at the eave or soffit for seasonal lighting. Includes the switch, the extra run, and the soffit-height box.

Plumbing PRO

Plumbed fixtures beyond the bathrooms counted in Layout & Openings β€” e.g. kitchen sink, dishwasher, laundry hookup, utility sink, wet bar, or fridge water line. Each adds supply branch, drain/vent, and a shut-off valve. Hose bibs are counted separately below.

Supply-only β€” no drain or vent. Frost-free is required in freezing climates. Each includes the wall penetration and an interior shut-off.

Distance from the building to the water source connection β€” municipal meter/main, well, or existing service tap.

HVAC PRO

Left at 0, heated area follows the slab footprint. Tubing length is area x (12 / spacing), so 12" oc is about 1 lf per sq ft and 6" oc is about 2.

Attic-mounted exhaust fan for night cooling. Priced with the required attic intake venting.

Interior Finishes PRO

Bathroom Details PRO

One panel per bathroom, driven by the Bathrooms count in Layout & Openings (full baths get the complete set; half baths get toilet, vanity & flooring). Prices are editable in the Material Unit Costs and Labor Rates cards.

Material Unit Costs Load Starter Pricing  Β·  Load All  Β·  Hide/Show

All prices start at $0 so nothing is ever estimated from a number you didn't enter. Enter your own supplier and crew costs, or load a set of regional averages as a starting point and adjust from there. Load Starter Pricing fills only the items this project's current options actually price; Load All fills every field.

Concrete / Masonry
Framing / Lumber
Exterior Envelope
Doors & Windows
Site Work
Septic
Well
Electric Service Entrance
Electrical
Plumbing
HVAC
Radiant Floor Heat
Mobile / Manufactured Home
Interior Finishes
Bathroom β€” Toilet
Bathroom β€” Shower & Tub
Bathroom β€” Vanity

Labor Rates PRO Hide/Show

Concrete / Masonry
Framing / Lumber
Exterior
Doors & Windows
Electrical / Plumbing / HVAC
Radiant Floor Heat
Mobile / Manufactured Home
Septic
Well
Electric Service Entrance
Interior Finishes
Bathroom

Overhead, Contingency & Contractor Fee PRO

Permits PRO

Trade and site permits appear in the estimate only when that scope is included. Set any fee to 0 to omit it.

Building & Zoning
Trade Permits
Access & Right-of-Way

Driveway and right-of-way fees appear when a driveway is included in Site Work. Use the DOT line when the access ties into a state-maintained road.

Environmental & Land Disturbance

Environmental fees appear once site work disturbs land. Stormwater/NPDES typically triggers at 1 acre of disturbance β€” adjust the threshold to match your jurisdiction.

Impact & Tap Fees

Not permits, but they land on the same invoice and are often the largest single line. These are always charged as dollar amounts, never as a percentage of valuation.

Unlock Pro Features

Get Exterior Envelope, Electrical, Plumbing, HVAC, Interior Finishes, Bathroom Details, Site Work, Labor Costs, Overhead & Markup, Cost Calculator, CSV Export & Unlimited Projects

Estimator Pro β€” 30-day free trial, then $29/month or $290/year

30-day free trial, card required. The subscription renews automatically β€” $29/month or $290/year plus applicable tax β€” until you cancel. Cancel anytime from Manage subscription; cancellation takes effect at the end of the current billing period.